For such a small scope of work, the icehouse rehabilitation has included some remarkably creative one-offs. The garapa door is one such project: a challenging initiative to upcycle reclaimed garapa decking from Rosslyn’s house deck into a minimalist mechanical room door perfectly camouflaged into tbe bathroom walls.
Today I can report that it’s been a triumph!
Garapa Door (Photo: Geo Davis)
Dramatic lighting sure brings the oiled garapa to life! Amber grained, horizontal continuity, just barely framed, an intriguing section of the wall that will allow discrete access to the mechanicals. Polished nickel hinges and passage set, but nominal attention drawing exception to the otherwise seamless expanse of repurposed garapa.
Garapa Door (Photo: R.P. Murphy)
I’ll update with a photo once the rest of the hardware is installed…
After many months of transformation Rosslyn’s icehouse rehab is approaching the finish line. The sum total is conceivable if not yet 100% visible. Many loose ends begging for attention, some small, some not so small. After some time away, adventuring, observing from afar, willing and coaxing and cajoling the project toward completion, I’m back. Boots on the ground. Evaluating the finish schedule and shuffling priorities and trying not to hyperventilate, focusing on the many miraculous accomplishments and essaying to stay calm about the still-to-do’s. Straddling the well-done’s and the still-to-do’s are the icehouse east and west decks. This evening I’ll catch up up on the decking, decking, decking!
Icehouse East Deck (Photo: R.P. Murphy)
You may remember that installation of the garapa decking was already completed on the east deck. In the photo above, you’re viewing the stairs up to the east entrance door. In the photograph below offers more of a 45° angle from southeast toward the northwest, capturing the entire east side deck.
Icehouse East Deck (Photo: R.P. Murphy)
You may recognize those two photographs from my previous post showcasing the completed east deck. Today’s news is that oiling and deck lighting have been completed.
Icehouse East Deck After Oiling (Photo: Geo Davis)
In the photo above and below, you will note that the deck lighting still needs to be pushed in and secured. We will wait to do this until the oil has completely dried, approximately 2-3 days to be safe.
Icehouse East Deck After Oiling (Photo: Geo Davis)
The oil definitely brings out the grain and color. This will fade as sun and weather interact with the oil sealed wood. By late summer, the deck will have mellowed to a more patinated tan or tannish gray. In late autumn we’ll apply another coat of oil this this and the other garapa decks to help preserve them during the long North Country winter.
Icehouse West Deck, Pre-Decking (Photo: R.P. Murphy)
West Deck Progress
The west deck of the icehouse is smaller than Rosslyn’s main house deck but considerably larger than the icehouse’s east deck. Although it does not have the challenge, posed by the stairs on the east side, it does accommodate a hot tub. That said, installation is moving swiftly afoot. The image above shows the structure ready for decking. And the image below, only a few days later, shows the better part of a third complete.
Garapa Decking Icehouse West Deck (Photo: Eric Crowningshield)
If you look closely, you’ll see that there are still plenty of garapa pegs that need to be installed in the skirt boards. That’s definitely time consuming. But what a spectacular result when complete!
Garapa-ing Icehouse West Deck (Photo: Geo Davis)
As of today, less than a third of the decking remains to be installed, and the hot tub — still missing its permanent cover — is in situ, full of water, and *ALMOST* ready for a trial run!
In short, there are still plenty of projects to button up before the icehouse rehab is complete, but there’s also a lot to celebrate. And tonight we’re toasting the decking, decking, decking. Soon it will be done!
With many culminating accomplishments to celebrate as we inch, leapfrog, creep, hurtle,… toward the icehouse rehab finish line, I’ve inevitably overlooked a couple. Maybe a few. One of those notable achievements is completion of framing and decking the icehouse east deck.
Icehouse East Deck (Photo: R.P. Murphy)
Although we still need to finish installing plugs and oil sealing the garapa deck, framing and decking the east deck is finito. And it looks superb!
In the photograph above (and the next to below), the framing is complete, and most of the garapa has been installed. Only the risers and skirting are missing.
Icehouse East Deck (Photo: R.P. Murphy)
Even incomplete, the handsome honey hues and minimalist design are eye catching. Such warm coloration and intriguing grain!
Icehouse East Deck (Photo: R.P. Murphy)
And then the risers and skirting were installed and everything came together into a seamless whole. Cohesive, integrated design resolves subtly, allowing the elegant historic building to preside over an environment as welcoming and user friendly as it is timeless.
Icehouse East Deck (Photo: R.P. Murphy)
Note that Brandon has roughed in the lighting which will make for safe after-dark navigation, unifying this nighttime lighting with the house and waterfront.
Icehouse East Deck (Photo: R.P. Murphy)
Imagine, if you can, this wood accentuated by this same afternoon light a couple of weeks from now once oiled and gentled into the landscape with soon-to-be planted beds on the south, east, and north sides. I’m looking forward to it!
Just over a week ago I posted a prologue to today’s garapa paneled bathroom update. I apologize if it felt a little half baked.
For just a little longer, I’ll keep you in suspense before I share photos of the now completed garapa installation. Remember, anticipation is half the pleasure! (Source: Garapa Paneled Bathroom, Pt. 1)
I wasn’t teasing out the update for the sake of suspense. I promise. And today’s post will hopefully offer some recompense for your patience. But there was a lot — a LOT — to pack into a single post, so I felt it more reasonable to subdivide it into a couple of installments.
I’m dividing this… update into two posts to fairly review and showcase a project that has taken the better part of a year from beginning to finish… (Source: Garapa Paneled Bathroom, Pt. 1)
Besides, I was about to head into the Gila Wilderness when Eric Crowningshield gave me the good news, and I simply couldn’t squeeze it all in before going off-line adventuring for a week sans connectivity, computer, etc.
But now it’s time to celebrate completion of the icehouse bathroom’s garapa paneling, to showcase the photos, and to sing praises for the carpenter behind this monumental accomplishment.
Eric Crowningshield Installing Garapa Paneling in Icehouse Bathroom (Photo: R.P. Murphy)
Garapa Paneling the Bathroom
Upcycling Rosslyn’s deconstructed garapa decking into interior paneling has occupied many members of the icehouse rehab team for months. It’s been a challenge. Every. Single. Step. From demo’ing the old deck (while painstakingly deconstructing, selecting, and grading the most reusable and aesthetically pleasing garapa) to troubleshooting, iterating, and finally re-fabricating the decrepit, timeworn decking into elegant interior finish material, this upcycling endeavor has been an epic quest. And the exacting preparation demanded even more exacting installation.
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
Today we celebrate Eric’s conscientious carpentry and dogged determination, shepherding the garapa paneling to its exquisite completion! (It’s worth noting that Matt Sayward assisted in the early stages of installation, but Eric soon took ownership of the project to ensure 100% consistency.)
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
The following excerpts and photos offer an interesting perspective as Eric worked through installation of the garapa paneling.
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
It should go a little quicker now with the breaks in the runs [and] not needing to lineup 4 miters in one location. Nothing about this is easy but my gosh probably one of the most rewarding project thus far… — Eric Crowningshield
Garapa Paneling Progress in Icehouse Bathroom (Photo: Eric Crowningshield)
On the left side of this door it is 3-1/8” from the inside of the door jam to the tile. Do we not put garapa and run a 3” trim around the jam leaving a 1/8” reveal? On the other side we only have about 2”, so I’m guessing it may look odd with wider trim on the left and top. — Eric Crowningshield
The best way to handle the garapa around the door is difficult to determine from afar. My suggestion is that you and Peter look at it together and come up with the best solution. We have some asymmetry to deal with. Tricky. — Geo Davis
I’m going to put horizontal pieces on the left side before trim because the trim on the other side is around 1 3/4” so I think it would look better keeping the same size around the door. — Eric Crowningshield
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
I went down tonight for a few hours and ripped some [garapa] down to the same width so the last 4 rows will be the same. Otherwise we were going to end up with a 1” or so piece around the ceiling. I put another row of that up so only 3 rows left. — Eric Crowningshield
How much did you have to takeoff of each of the boards for the last four courses? Or, better question, how different will they be from the rest of the words? — Geo Davis
About 3/8 of an inch. The boards I put up throughout the whole wall ranged from 4” down to 3-5/8” and a few at 3-1/2”. I had 13” left so I was doing 3-1/4” for the last 4 rows. — Eric Crowningshield
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
It is completed!!! I love saying that. — Eric Crowningshield
Superb! Congratulations, Erik. It really looks amazing. I hope you’re proud of the results. I know this has been an almost endless process from demoing the deck to installing the paneling, but a worthwhile adventure. Well done. Is everything wrapped up around the door as well? — Geo Davis
No, we are going to adjust the casing so it is the same size trim on each side. Yes, super excited about it and everything it means to you and the story behind it all! — Eric Crowningshield
Garapa Paneling Progress in Icehouse Bathroom (Photo: R.P. Murphy)
Bravo, Eric Crowningshield, for completing installation of the glorious garapa paneling in the icehouse bathroom. What a tour de force! It’s hard to believe that this is the same decking your team deconstructed from Rosslyn’s deck a year ago. Many months of brainstorming, experimenting, re-milling, oiling, and installing later this masterpiece is born. Hurrah! — Geo Davis
Garapa Paneled Bathroom (Photo: R.P. Murphy)
It was a task for sure, but the end result more than makes it worth the struggles. It is a must see in person although the pictures capture how amazing it looks, [though] it’s even more impressive in person! — Eric Crowningshield
Garapa Paneled Bathroom (Photo: Eric Crowningshield)
I forgot to tell you. I found one board with plugs still in it, so if you look close it is about midway up the wall between the utility and niche. A couple small ones in the niche as well. I thought that would be pretty cool to help tell the story about it being old decking. Wish I found more. — Eric Crowningshield
Garapa Paneled Bathroom (Photo: Eric Crowningshield)
Thanks for letting me know. I will hunt for them next time I’m back. Although you should’ve left it to see if I noticed! — Geo Davis
Garapa Paneled Bathroom (Photo: R.P. Murphy)
This subtle upcycling/repurposing souvenir isn’t quite discernible in the photo above, but it thrills me. Can’t wait to inspect in person!
Garapa Paneled Bathroom (Photo: R.P. Murphy)
I look forward to sharing more photographs of the icehouse bathroom as it approaches completion. It’s so close… Until then, I’d like to express my profound gratitude to Eric for transforming this vision into reality. What an extraordinary accomplishment!
Eureka! After many months of brainstorming, experimentation, painstakingly protracted preparation, troubleshooting, oiling, and meticulous installation, the garapa paneling in Rosslyn’s icehouse bathroom is complete. What a remarkable journey it’s been, and the final results are breathtaking.
Wayne Oiling Deck in 2009 (Photo: Geo Davis)
Garapa Backstory
Our garapa backstory has its beginning waaayyy back when we built the original garapa deck on the west side of Rosslyn’s ell.
Let’s start by rewinding the timeline to 2008-9. Building the new deck and installing garapa decking was the proverbial caboose in a virtually endless train of construction that started in the summer of 2006. (Source: Garapa Decking 2008-2009)
A touch melodramatic, but the metaphor was (and is) 100% appropriate. It was nothing short of triumphant to finally complete the deck, a real and symbolic final frontier between construction site and comfortable home. It was a much anticipated extension of our indoor living space, a convenient way to access three entrances to the home, and a private exterior zone to dine and relax and entertain.
Carley & Bentley on Old Deck (Photo: Geo Davis)
Fast forward a couple of years, and the triumph began to tarnish.
Long story short, the original deck failed. Not the garapa decking which performed admirably year-after-year. But the substructure.
[…]
Rather than dwelling on the achilles heal that lamentably undermined the integrity of three critical substructures — Rosslyn’s house deck, boathouse gangway, and waterfront stairs — I’ll just say that all three experienced premature decay and rot of the structural lumber…
[…]
Because the substructures began rotting virtually immediately after construction, we spent a decade and a half chasing the problem, scabbing in new lumber, etc. But within the last few years the failure was beginning to outpace our ability to provide bandaids and we scheduled replacement. (Source: Deck Rebuild)
Carley Overseeing Demo of Old Deck (Photo: Geo Davis)
Eric Crowningshield’s team deconstructed much of the deck during the late spring of 2022. When Hroth Ottosen and David McCabe joined them at the beginning of the summer they determined that it was necessary to fully replace rather than repair the existing deck.
Old Deck Demolition (Photo: Geo Davis)
The deconstructed garapa was separated from the structural demolition debris, the highest grade (ergo most salvageable) material was graded, and the best preserved and most character-rich garapa was stored for repurposing in the icehouse rehab project. Then began a lengthy, painstaking upcycling journey.
We’ve been upcycling garapa decking from Rosslyn’s 2008-9 deck that we salvaged and laid aside this past summer. Spanning half a year so far — from deconstructing and culling reusable material midsummer to multiple experiments determining optimal dimensions for adaptive reuse as bathroom paneling — we’re now scaling up production and the results are impressive. (Source: Upcycling Garapa Decking)
By “multiple experiments” I mean empirically evaluating the most aesthetically pleasing, most practical, most installable, and most structurally durable form for the Garapa decking-turned-paneling. Yes, that’s a lot of *mosts* to undertake, but it’s not even the full scope of the challenge.
In addition to devising a perfect product, we needed to coordinate an upcycling process that could be undertaken successfully on site. No loading, trucking, unloading, offsite milling and finishing, reloading, trucking, unloading, storing, etc. It might have been more affordable, and it certainly would’ve been less time consuming, to outsource this project. But that would’ve shifted several variables:
Increasing carbon inputs would have been inconsistent with our reuse objectives.
Transferring oversight to a third party would have reduced our design supervision (while necessitating excess production to ensure sufficient quality during installation.)
Undertaking the upcycling process at Rosslyn allowed for agility and flexibility during the fabrication process, enabling the team to repeatedly test samples in the icehouse, catching small details that might otherwise have been discovered too late, making small alterations, etc.
And despite the inevitable strain (as well as the potential for setbacks) that crept into the equation by committing to on-site fabrication, tackling this challenge in house ensured maximum creative control, significant learning opportunities, rewarding problem solving scenarios, a personalized sense of ownership for those who participated in this project, and a heightened sense of accomplishment upon completion.
In short, upcycling our old garapa deck into the paneling that now distinguishes our icehouse bathroom was a vital, integral component of this adaptive reuse adventure. It was important to me that our team of makers and re-makers have the opportunity to invest themselves fully in this rehabilitation project, that each individual who verily toiled and trusted our vision experience a profound pride of ownership and accomplishment, and that the hyperlocal DNA of this two century old property be honored by favoring ingenuity and endurance over convenience.
From the outset several were intrigued with the potential for this salvaged lumber.
Hroth was an especially good sport, planing board after board and trimming the edges to determine what would work best. (Source: Upcycling Garapa Decking)
Upcycling Garapa (Photo: R.P. Murphy)
As the wear and tear of a decade and a half— heavy foot traffic, enthusiastic labrador retrievers, hardy North Country winters, group grilling and furniture dragging, wine spills and miscellaneous mementos from lots and lots of living — was gradually milled away, the garapa’s handsome heart began to re-emerge.
We have begun re-milling and re-planing garapa decking salvaged from Rosslyn’s summer 2022 deck rebuild. These sample boards are among the many weathered specimens carefully removed this spring and summer prior to rebuilding Rosslyn’s deck substructure and re-decking with new garapa. Hroth’s patient exploratory experimentation is the first phase in our effort to adaptively reuse this character-rich material in the icehouse. (Source: Upcycling Decking Debris)
At last, Hroth perfected the prototype. He then developed a process, a repeatable protocol, for which we could standardize the results primarily relying upon a tablesaw and bench planer. Then he taught Tony how to reproduce the same results in sufficient quantity to panel the still unframed icehouse bathroom.
Tony Upcycling Garapa Decking (Photo: R.P. Murphy)
Tony is beavering away industriously… upcycling garapa decking into pristine planks for paneling.
[…]
It’s a slow and painstaking process that demands plenty of patience and focus, but… transforming debris into beautiful finish paneling will prove rewarding, for sure… Tony is even beginning to appreciate what magnificence he is bringing into existence. (Source: Upcycling Garapa Decking)
And so began a winter quest to reinvent debris as functional design-decor.
Time for a progress report on the garapa paneling that will soon embellish the icehouse bathroom. We started out gently easing the edges, but several iterations later we’ve settled on a full roundover. (Source: Garapa Roundover: Easing the Edge)
Months into this painstaking re-manufacturing process, several others had helped Tony from time to time, but there was no illusion. Tony had taken ownership of the garapa upcycling quest!
I joke with Tony that he’s investing lots of love into transforming this material. From debris to centerpiece… he’s literally been working and reworking [this upcycled garapa] since last September or October. That’s a LOT of love! (Source: Garapa Roundover: Easing the Edge)
By late winter Tony had finished planing (down to 9/16”) and dimensioning (down to 4”) the garapa decking. At almost a thousand linear feet we paused and reevaluated the quantity to be certain we would have sufficient usable material for the entire interior of the icehouse bathroom (walls, niche, and mechanical room door).
We revisited options for joining the paneling. To be fastened horizontally to the studs with concealed fasteners, joining the boards would be an important way to stabilize and visually address the gaps between boards. We considered tight lap joints and nickel gap lap joints, eventually settling on a nickel gap T&G type joint. But how best to accomplish this?
Peter’s solution for the ash and elm flooring seemed like our best option for the garapa paneling. We would create garapa splines that would fit into grooves in the sides of the paneling boards. If expansion and contraction (think visible gaps, between boards, etc.) weren’t an issue it might have been viable to just but the boards up against each other. But it’s a bathroom, so fluctuating humidity levels definitely needed to be factored into the equation. The splined joint would be a perfect solution.
And finally there was the question of edging. I wanted to ease the edges just enough to accentuate horizontal shadow lines (which stylistically echo the T&G nickel gap in the rest of interior) while deemphasizing dimensional disparity between boards. So a router joined the production protocol as Tony uniformly finished the visible edges of the paneling.
Garapa Edge Profiles v2.0 (Photo: Geo Davis)
And then there was the final step, oiling the garapa. As often, we turned to Bioshield Hard Oil for a hand rubbed, ecologically responsible finish. Eric’s team tackled the oiling, and the photo above gives you a preview of the garapa, edged and oiled. This was the final sample that we greenlighted before installation began.
And, for just a little longer, I’ll keep you in suspense before I share photos of the now completed garapa installation. Remember, anticipation is half the pleasure!
Installation of Garapa Paneling
I’ve dividing this monumental update into two posts to fairly review and showcase a project that has taken the better part of a year from beginning to finish. Thanks for your patience. I promise you that the photos you’ll witness soon, the finished bathroom paneling, will be worth the wait.
Many new and exciting thresholds crossed today. Supi, Calvin, and Tony started the stone hardscape project. Peter and Justin installed the columns and book matched ash transition upon which they rest. We finalized the shower glass order, and we *almost* finalized the coffee bar countertop stone. Eric arrived at the halfway point in the bathroom garapa paneling. And Brandon started installing the wiring for the hot tub. What a day!
Brandon Wiring the Hot Tub (Photo: Geo Davis)
It’s pretty exciting yo be one step closer to our first soak in Rosslyn’s icehouse spa! Brandon and his assistant will be back first thing tomorrow to wrap up the preliminary wiring so that the slab can be poured later this week. Hot tub, wiring, concrete slab, and then… we’ll be one giant step closer to soaking our bones and celebrating.
Brandon has been for a couple of years as the electrician for the boathouse gangway / waterfront rehabilitation, the deck rebuild, and the icehouse adaptive reuse. He’s been a tremendous asset, problem solving mystery after mystery, and shoehorning his work into challenging intervals throughout all three projects.
We can’t wait to celebrate another finished project soon!
A Jeroboam of gratitude to Peter Vaiciulis for agreeing to fabricate a custom elm and garapa threshold for the icehouse bathroom doorway. Conjoining two two dissimilar hardwoods is challenging enough, but I added an extra detail (or two) that you just might be able to spot in the photo below.
Peter Vaiciulis Fabricating Elm/Garapa Threshold (Photo: R.P. Murphy)
The strip of garapa (closer to Peter in the photo above) will form the interior side of the threshold, integrating the slate floor and antique door with the upcycled garapa paneling. The highly charactered elm — grown, harvested, aged, milled, and finished on Rosslyn’s property — will integrate with the ash and elm flooring in the main floor of the icehouse.
If you look closely you’ll see two bowties, one elm and the other garapa, sitting on the table next to the threshold. Peter is preparing to router and chisel these bowtie joints (butterfly joint) into the new threshold, resulting in a visual testament, indeed a subtle celebration of two dissimilar hardwoods united into a single door sill.
Sketch for Elm/Garapa Threshold (Photo: Geo Davis)
I gave Peter the quick sketch above several weeks ago with an explanation for what I envisioned. He instantly understood and accepted the challenge. His woodworking, joinery, and custom carpentry have proven indispensable not only in metamorphosing my ideas into reality, but in mentoring many members of the team.
Threshold & Bowties, Haiku
Crossing a threshold with the hammer and chisel, hardwood joinery.
— Geo Davis
Chiseling the Threshold
In the video snippet below a hammer and chisel begin to reveal the location for one of the soon-to-be embedded bowties.
Time for a progress report on the garapa paneling that will soon embellish the icehouse bathroom. We started out gently easing the edges, but several iterations later we’ve settled on a full roundover. Here’s why…
Garapa Edge Profiles v1.0 (Photo: Geo Davis)
Roundover Rewind
Because the garapa upcycling backstory helps illuminate the decision to edge these boards with a diminutive roundover, let’s rewind the time machine. The garapa we’ll be installing in the icehouse bathroom as paneling began service at Rosslyn back in 2008 as decking, and it served admirably for almost a decade and a half, enduring summer feasts and foot stomping fêtes, winter snow and ice, and all manner of wear-and-tear. Last summer we deconstructed the deck, not because it was failing, but because the TimberSIL substructure was kaput.
Grading Garapa for Upcycling (Photo: Tony Foster)
After dismantling the old deck we sorted out the best garapa decking boards for upcycling; “cherry picked” and inventoried the best-of-the-best material to ensure sufficient linear footage for adaptive reuse in the icehouse; and then began the painstaking process of trimming, re-dimensioning, planing, and grooving the edges that will be conjoined with garapa splines during installation.
A little over a month ago Peter experimented with several profiles. He started by just barely breaking/easing the edge two ways: sand paper and a single pass with a hand plane at 45°. Too subtle. He eased slightly more and then a little more. He also tried a subtle v-groove (two micro-chamfers), and we finally settled on a full roundover. Both the chamfer and round over details were achieved with a handheld trim router and a super small round over bit.
Garapa Edge Profiles v2.0 (Photo: Geo Davis)
Why Roundover?
Why did I make this decision? Because the garapa is repurposed, it is charactered and irregular. Preserving this patina is important to the finished look we’re endeavoring to achieve. A subtle wabi-sabi story is being told not only in the varied lustre and texture of these boards, but also the handworked (ergo slightly irregular) dimensions. When installed there will be some variability in the thickness of the boards. The roundover will create a shadow line while accommodating the slight inconsistency from board to board, and the quarter round profile will be less severe than the 45° chamfer would have been. I’m hoping that it will all come together with a a subtle horizontal linearity that creates cohesion for the well worn wood.
Tony Roundover Edging Garapa (Photo: R.P. Murphy)
Well Worn & Well Worked
It’s worth noting that the age and patina were showcasing with this upcycled lumber has only been made viable through the guidance of Hroth, Peter, and Pam and Tony’s devoted attention and immeasurable hard work over many months. I joke with Tony that he’s investing lots of love into transforming this material. From debris to centerpiece. In the photo above he’s roundover edging boards that he’s literally been working and reworking since last September or October. That’s a LOT of love!
Installation of clapboard is complete! All four façades of Rosslyn’s icehouse are now handsomely clad in cedar, primed and painted before installation, ready for nailhead touchup as temperature rises in the weeks ahead.
Clapboard Complete, March 23, 2023 (Photo: Geo Davis)
Especial accolades are due Supi and Peter who stayed late last night to finish all but the last four boards at the apex of the gable end. And Calvin showed up at the crack-of-dawn this morning to finish up the elevation that he had started about a week ago. Justin has been a big help on this east elevation, and I’m probably overlooking someone. Better dig back through my photos!
To everyone who helped wrap this historic icehouse and clapboard and trim, so that we’re ready when the windows arrive in a month and a half… Thank you, all. Working on clapboard siding off-and-on during these winter months whenever conditions permitted made for an unpredictable workflow. But you persisted, and now we can all appreciate the rewards. Congratulations!
Clapboard Complete, March 23, 2023 (Photo: Geo Davis)
Peter is prepping the clapboard sunburst motif elements that will infill the two triangles flanking the gable end window. The entrance door will be delivered shortly, and the garapa decking material will be ordered next week. Little by little this building is starting to resemble the plan…
Rendering for Icehouse Rehabilitation, East Elevation (Source: Tiho Dimitrov)
What wintery wonders shall I share with you today? How about a celebration (and showcase) of upcycled Christmas gifts dreamed into existence by three allstar members of our icehouse rehab team?
Upcycled Christmas Gifts from Pam, Hroth, and Tony (Photo: R.P. Murphy)
[pullquote]These upcycled Christmas gifts are a product and symbol of renewal.[/pullquote]
I talk and I type, but these three creative characters have reimagined and reinvented deconstruction debris into functional art and decor. They transformed a piece of old garapa decking and a handful of icehouse artifacts (uncovered during laborious hand excavation for the new foundation) into a handsome coatrack, and they transformed a gnarled piece of rusty steel back into a museum-worthy ice hook that turns the clock back 100+ years.
Let’s start with the photograph at the top of this post which Pam accompanied with the following note of explanation.
Hroth, Tony and I wanted to wish you both a very Merry Christmas. We came up with the idea to make a coat rack out of repurposed items. The wood is old garapa. I found the spikes in the icehouse during inventory and the hook was also discovered in the icehouse during excavation for the concrete floor/footers. Hroth custom made a handle for the ice hook. We also wanted to add a new hummingbird feeder to the garden outside of the breakfast area. Merry Christmas! — Pamuela Murphy
Perfection! Garapa upcycled from Rosslyn’s 2008-9 deck build and miscellaneous ice hauling artifacts reconciled and reborn as a new coat rack that will greet icehouse visitors upon entering the miniature foyer, and a restored antique ice hook that will be displayed prominently in the main room. Bravo, team.
Upcycled Christmas Gifts from Pam, Hroth, and Tony (Photo: R.P. Murphy)
I was curious how Hroth had fabricated the garapa handle for the ice hook out of old decking boards. It’s so round/cylindrical that it looks as if he’d used a lathe.
Two pieces of garapa laminated together. Started out about a 16 inch because it was easier to run through the table saw. I made an octagon out of it on the table saw, then used the big belt sander… I roughed it up a little bit. Didn’t want it to look too perfect. Then Pam suggested that we take a propane torch to it. Made it look older.
It was a fun project. I still need to seal the wood and the metal. Penetrating sealer works well on metal. It’s sharp… We were thinking you might want to put some corks on the ends… or garapa balls. That was the first thing I thought of. We can certainly do that. — Ottosen Hroth
Carving tiny garapa orbs to install on the spikes strikes me as the perfect way to complete the coat rack so that jackets can be hung without getting spikes. It’ll be a difficult-but-intriguing challenge! There must be some technique for creating a small wooden sphere out of a block of wood. Hhhmmm…
I can’t imagine more perfect Christmas gifts. Their collaboration has rendered layers of Rosslyn history — from the late 1800s and early 1900s when the icehouse was in use, through 2008 when we built the deck that yielded this garapa, to 2022 when the old deck was deconstructed and the icehouse rehabilitation was initiated — into timeless beauty that will adorn the icehouse when it is introduced/revealed next summer. These upcycled Christmas gifts are a product and symbol of renewal. Our gratitude is exceeded only by Hroth’s, Pam’s, and Tony’s collaborative accomplishment.
Upcycled Christmas Gifts (Photo: R.P. Murphy)
Upcycled Christmas Gifts (Photo: R.P. Murphy)
Upcycled Christmas Gift 2022: antique ice hook with handmade handle (Photo: R.P. Murphy)
The flip-through gallery above offers a few more details, and all three (as the two featured photographs above) are documented inside the icehouse with mid-construction backdrops: old studs with new spray foam insulation and new subfloor ready for interior framing and hardwood flooring. It’s tempting to offer tidier or even fancier backdrops, but authenticity prevails. Future decor created from old materials, documented midstream the icehouse’s transformation. Future, past, and present. Concurrent history and hope, a timeless present, an artistic representation of this liminal moment.
Backstory to Upcycled Christmas Gifts
Susan and my gratitude to Pam, Hroth, and Tony is (and obviously should be) the focus of today’s Rosslyn Redux installment, but I can’t conclude without first considering a slightly more amplified retrospective, the backstory, if you will, to the new coat rack and restored ice hook.
Let’s start by rewinding the timeline to 2008-9. Building the new deck and installing garapa decking was the proverbial caboose in a virtually endless train of construction that started in the summer of 2006. (Source: Garapa Decking 2008-2009)
In the photograph below, taken exactly fourteen years ago today, Warren Cross is putting the finishing touches on our first deck build. Although the perspective may be misleading given the still unbuilt garbage and recycling “shed” which today stands directly behind Warren, this is the northernmost extension of Rosslyn’s deck. The stone step (actually a repurposed hitching post chiseled from Chazy and Trenton limestone (aka “Essex stone”) and the rhododendron shrubs are not yet in place either.
But it you imagine the perspective as if you were standing just north of the morning room, looking back toward the carriage barn and icehouse, you’ll be oriented in no time. Oriented, yes, but nevertheless a bit disoriented too, I imagine, as you look upon a carpenter laboring in the snow to scribe and affix the garapa deck skirting / apron that will complete the installation that had began in the autumn with far more hospitable conditions.
Warren Cross completing garapa decking installation on December 22, 2008 (Photo: Geo Davis)
It’s worth noting that Warren, already in his mature years when he worked on Rosslyn with us, not only threw himself into difficult endeavors like the one above, he contributed decades’ of experience and an unsurpassed work ethic that inspired everyone with whom he worked in 2008 and 2009. But there’s an even more notable memory that describes Warren. He was a gentleman. And he was a gentle man. It was a privilege to witness Warren’s collegiality, and Rosslyn profited enduringly from his expertise. But it was his disposition, his consideration, and his kindness that make me nostalgic when I hear him mentioned or when I catch sight of him in photographs.
In terms of memories conjured by this repurposed garapa decking, I should include Hroth’s “research” this past autumn into how best we might reuse the lumber. There was such anticipation and excitement in the hours he experimented and explored. The image below perfectly illustrates the hidden gold just waiting to reemerge from the deconstructed decking material.
Hroth is continuing to experiment with the garapa decking we salvaged from our summer 2022 deck rebuild. I’m hoping to repurpose this honey toned Brazilian hardwood as paneling in the icehouse bathroom. (Source: Upcycling Decking Debris)
Hroth’s discoveries underpin our plan to panel the interior of the new icehouse bathroom with what for a decade and a half withstood the Adirondack Coast elements season after season, and a rambunctious parade of footfalls, barbecues, dog paws, wetsuits, etc. It’s as if the new coat rack exudes the anticipation and optimism that many of us brought to the journey of upcycling the old decking into the new paneling.
And there is an aside that I’m unable to resist mentioning. Pam’s late husband, Bob Murphy, who worked as our property caretaker and became an admired and dearly respected friend, several times removed and reinstalled Rosslyn’s garapa decking over the years — monitoring, triaging, and compensating for the failing TimberSIL substructure. He knew that we would need to rebuild the entire deck soon, and yet he waged a relentless campaign to extend the useful life of the deck as long as possible. I think he’d be proud of the work accomplished by the team this summer, and he sure would have loved being part of that team! And the icehouse rehab would have thrilled him. Needless to say, these upcycled Christmas gifts from Pam and Hroth and Tony also exude Bob’s smile, familiar chuckle, and that mischievous twinkle in his eyes.
And what about that antique ice hook?
I mentioned above an antique ice hook, and the photograph below illustrates exactly what I was referring to. Disinterred by Tony while cleaning out and grading the dirt floor of the icehouse, this badly corroded artifact bears an uncanny resemblsnce to a common tool of yesteryear: the handheld hook. This implement was most often used for 1) grabbing and hauling ice blocks and/or 2) carrying hay bales. The location where this relic was discovered (as well as plenty of examples uncovered by quick research online) strongly suggest that this is an antique ice hook. (Source: Icehouse Rehab 01: The Ice Hook)
Isn’t a beauty? Well, rusty and corroded, but a beauty nonetheless, I think.
Antique Ice Hook, artifact unearthed during the icehouse rehabilitation, 2022 (Source: R.P. Murphy)
The prospect of restoring that ice hook crossed my mind at the time. But it struck me as a challenging proposition given the advanced state of decay. What a surreal transformation from rust-crusted phantom to display-ready relic! It too is marinated in memories, some recent and personal, others vague and distant. In the near rearview mirror are the painstaking efforts made by our team to secure the historic stone foundation beneath the icehouse while ensuring the structural integrity demanded by modern building codes. A labor of loves on the parts of so many. And today we can look back from the proud side of accomplishment. As for the more distant rearview, the antique mirror has succumbed to the influence of time, the glass crazed and hazy, the metallic silver chipped and flaking. And yet we can detect traces of laughter and gossip as blocks of ice were cut from the lake, hooked and hauled up to the icehouse, and stacked in tidy tiers for cooling and consumption during temperate times ahead.
A Glimmer of Springtime
In closing this runaway post, I would like to express my warmest gratitude for the upcycled Christmas gifts above, and for a new hummingbird feeder to welcome our exuberant avian friends back in the springtime. Taken together this medley of gifts excite in Susan and me the enthusiasm and optimism for the coming months of rehabilitation and mere months from now the opportunity to celebrate a project too long deferred and so often anticipated. With luck we’ll be rejoicing together in the newly completed icehouse by the time the hummingbirds return to Rosslyn.
Hummingbird Feeder 2022 Christmas Gift from Pam, Tony, and Hroth (Photo: R.P. Murphy)
Thank you, Pam, Hroth, and Tony for these perfect presents. And thank you to everyone else I’ve mentioned above for enriching this home and our lives. I look forward to rekindling these memories when I hang my coat or my cap up each time I enter the icehouse. Merry Christmas to all!
Surplus Building Materials: garapa, slate, and marble (Photo: R.P. Murphy)
Exciting icehouse rehab progress in recent days, so I’m due for an exciting update or two. But first I need to whittle down the backlog of overdue posts, especially some of those dealing with how we’re transforming some of our surplus building materials into exciting design elements in the reimagined icehouse. I can anticipate your interest flagging. Surplus building materials? Isn’t that about as exciting as yesterday’s leftover?!?! Well, perhaps, but hold that thought for a moment.
It struck me [recently] how similar edible leftovers and building materials can be. Think of surplus lumber and architectural salvage. They get pushed to the back of the proverbial fridge (in our case, usually one of the outbuildings) in the hopes of one day becoming the ingredients for something relevant and exciting and new. (Source: Leftovers as Ingredients)
In addition to repurposing this handsome historic building, we have endeavored to repurpose as many surplus building materials and architectural salvage artifacts as reasonable (i.e. functionally and aesthetically viable) in the design and rehabilitation process. (Source: Leftovers as Ingredients)
You may remember the mixed species flooring experiment (which incidentally is only a day or two away from an exciting update!) or the repurposed columns. Maybe the upcycled coatrack or the deconstructed-deck-upcycled-into-paneling project that’s already a couple of months in process… The truth is there are multiple ways that we’re endeavoring to breathe new life into construction leftovers and surplus building materials, and I’m embarrassingly overdue with updates.
So today I’d like to share with you a previously undisclosed scheme that’s at last approaching a final decision.
Surplus Building Materials: slate and marble (Photo: R.P. Murphy)
In addition to garapa walls — picture amber hued, time patinated, hand milled 4″ boards installed horizontally with a nickel gap — the icehouse bathroom floor and shower will be clad with leftover tiles. That’s right, surplus building materials. Did I lose you again? I hope not, because we’re getting pretty close to a truly handsome combination.
Most likely the floor will green-gray slate that we over-ordered during the Lapine House renovation in 2005-6. We loved it then, and we love it now. And it looks perfect with the upcycled garapa! The corner shower (two tiles walls and two glass walls) will likely have this same slate integrated into the east and south walls, but that detail is still evolving. I promise an update very soon, since we’re running out of time to make a final decision. Necessity is the mother of invention…
And the base of the shower will likely reuse marble tiles from our master bathroom shower. The understated calacatta marble complements the slate, and the contrast between the elegance of marble and the earthiness of slate is appealing, especially locating the marble at the base and the marble in a more prominent position. We’re also considering the possibility of combining another unlikely tile in the shower, smoky green 3″x6″ glass tiles, these surplus building materials from a change-order on a client project Susan designed a few years ago.
Surplus Building Materials: garapa, slate, and marble (Photo: R.P. Murphy)
Note: If you noticed a difference between the image at the top of this post and the similar image above, the first image offers a slightly truer color representation. Pam dampened the garapa and slate to approximate what the walls and flooring will look once the material is sealed.
I left you wondering, patiently waiting for a couple of weeks after the “Deck Rebuild” update. I promised a post specifically focusing on the garapa decking, but days turned into weeks, and no garapa gallery. Sorry. Rest assured it was an act of omission, my friends, not an act of commission. (Maybe “fall” earned its name as an abbreviation for “falling behind”?)
Before 2022 re-decking… (Source: Geo Davis)
But you needn’t wait any longer. Patience is overrated, and the new deck “eye candy” is ready. Pictures aplenty coming your way shortly, but first a little backward glance to Rosslyn’s first garapa deck waaayyy back in 2008-2009. You see, this newly completed deck is a redo of the same deck and decking completed during our epic rehabilitation project a decade and a half ago.
So, without further ado, let’s look at the first iteration of Rosslyn’s garapa deck.
Garapa Decking v1.0
Let’s start by rewinding the timeline to 2008-9. Building the new deck and installing garapa decking was the proverbial caboose in a virtually endless train of construction that started in the summer of 2006. And with winter upon us, December days flurrying past, the year coming to an end, carpentry conditions deteriorating rapidly, and the risk of missing yet another deadline, we were pushing hard to get the deck complete before 2008 morphed into 2009. Fortunately most of our crew had been with us for years and they were really, really good sports about giving everything they had to finish the year with a completed deck.
Although the deck had been underway for many weeks at this point, let’s start with a couple of cold and drizzly December 10, 2008 snapshots.
Doug’s Decking Tent, December 10 2008 (Source: Geo Davis)
This makeshift weatherproofing was an attempt to endure the increasingly cold and wet conditions as autumn gave way to winter. Decking was closer, closer, sooo close,… but not yet done. And the damp child found its way into every every gap between clothing, up sleeves, down collars. Winter’s warning was everywhere as the team hustled toward the finish line.
Wondering about that smiling, blurry apparition at the left? That’s Doug Decker, hustling to keep warm. (And his colleague, partially concealed beneath the tarp, is Jonathan “Boulder” Schier.)
Here’s another glimpse of the challenging conditions the crew endured during the final stretch of the garapa decking project almost fourteen years ago. It’s not east to discern but Doug’s under the tarp tent working on the stairway.
Of course, the only way to make these drizzly early December conditions look pleasant is to leapfrog forward to December 22, 2008.
Installing Garapa Stairs on December 22, 2008 (Source: Geo Davis)
You might almost miss freezing rain once a couple feet of snow have blanketed the North Country. In the photo above, a dauntless carpenter (either Kevin Boyle or Warren Cross, I believe, though perspective and bundling make me uncertain) is scribing and installing garapa treads, the final step to completing the deck. And despite the snow, it’s sunny and he’s dressed for success. This is certainly one of the downsides of installing a deck so late in the season (and one of the upsides of having such an amazing team of carpenters, willing to do whatever it takes to get the job done right and on time!)
Garapa Deck, January 1, 2009 (Source: Geo Davis)
What a perfect way to start the new year! Garapa decking installation complete; access to and from vehicles, garbage and recycling shed, side yards, safe and convenient; and an absolutely breathtaking addition to the property, transitioning perfectly from interior to exterior space.
Garapa Deck, February 2, 2009 (Source: Geo Davis)
One month later Rosslyn’s garapa deck looks as if it’s always been there. Patinated perfection. Still unsealed, waiting for more forgiving conditions, but that too will happen in due time. (Although it’s an off-topic segue, I will revisit this period between garapa installation and sealing down the line. There was an unfortunate hiccup that required attention, but — spoiler alert — it wasn’t actually caused by the gap between install and oiling. Another gap was the culprit…)
Wayne Gryk Sealing Garapa Deck, September 19, 2009 (Source: Geo Davis)
Friend and jack-of-all-trades-master-of-many, Wayne Gryk tackled the challenge of sealing the garapa decking 9-10 months after installation. He’s an artist, a perfectionist, a productive and diligent finisher, and exactly the right person for the final step in Rosslyn’s [first] garapa deck.
Home stretch… One of the boobytraps of sealing a deck is maintaining house access. It’s easy to accidentally close off entrance and egress without forethought about how you’ll access the dwelling while patiently swaying the often lengthy cure time. Fortunately this isn’t the sort of drama Wayne delivers
Sealing Garapa Deck, September 19, 2009 (Source: Geo Davis)
Wayne proceeded strategically, leaving a small unsealed “pathway” on the deck for us to enter and exit until the newly sealed decking had dried sufficiently. Once we could switch to another doorway, Wayne finish up the last little bit. In the photo below he’s almost finished, but you can already see the glorious accomplishment.
Wayne Gryk Sealing Garapa Deck, September 19, 2009 (Source: Geo Davis)
At this point it’d be reasonable to fast-track from 2009 to the present, 2022. With a newly rebuilt deck, brand new garapa decking installed, and a fresh coat of oil accentuating the unique color and grain of the garapa, it’s a site to behold.
But before showcasing the new decking, I’d like to make a quick pitstop on November 25, 2016 which is a handy example of the results of resealing our first garapa deck. Let’s start with a high sun, midday look across the deck shortly after oiling.
Resealing Garapa Deck, November 25, 2016 (Source: Geo Davis)
You’ll note the considerably darker decking in the photo above. This is not because we used a dark pigmented sealer (we have always used clear sealers). It’s the effect of graying as the deck ages. We generally allow a few years between resealing, in part because we actually really enjoy how the gray patinated decking looks next to the Essex quarried limestone (aka Chazy limestone) walls. But a sealed deck is better preserved against the snowy Adirondack winters, so we reseal in service to longevity. In this photo you can see how much depth and character the garapa exudes as it matures. Each season offers intriguing nuances to discover and appreciate.
Resealing Garapa Deck, November 25, 2016 (Source: Geo Davis)
The same deck, the same day, viewed from another angle highlights the honey and maple syrup range of Rosslyn’s garapa deck approximately eight years and several resealings after her debut.
In more recent years we allowed the decking to gray without resealing because we knew that the substructure was failing and deck replacement was iminent. In preparation for our summer 2022 deck rebuild we carefully salvaged all of this original garapa decking, and current experiments are underway to determine the most appealing adaptive reuse in the new icehouse project. (I’ll post an update on that soon!)
Next up? Installing garapa decking on the newly rebuilt deck!